Project Overview

The homeowner faced the risk of homeowners insurance cancellation due to the age and condition of their 30-year-old roof. In addition to roof failure at the edges, the home also had a large solar panel system that needed safe removal before reroofing could begin. The project required careful coordination between roofing and solar removal to ensure compliance with HOA regulations and long-term durability for the new roofing system.


Challenges and Goals

  1. Insurance Compliance: Replace the roof to meet homeowners insurance requirements.
  2. Solar Panel Removal: Safely remove and store solar panels, inspecting components for damage.
  3. HOA Compliance: Reuse existing concrete tiles to match neighborhood standards.
  4. Longevity: Install a high-performance roofing system to maximize durability and energy efficiency.

Our Solution

Material and Service Recommendations

  • Replace the existing underlayment with a double-layered 40# high-performance underlayment for superior waterproofing and durability.
  • Reuse the existing concrete tiles for aesthetic consistency and HOA compliance.
  • Partner with a trusted solar service company for professional removal, inspection, and reinstallation of the solar panels.

Preparation

  • Scheduled our solar service partners to safely remove and stack the solar panels on the ground, ensuring they were out of the way but accessible.
  • Delivered roofing materials to the property and loaded them onto the roof to keep the driveway clear for as long as possible.

Execution Process

1. Solar Panel Removal

  • Partnered with a solar service company to remove and stack all panels safely.
  • Inspected solar panels and components for performance or damage issues before reinstallation.

2. Roof Removal and Inspection

  • Removed half the roof tiles and stacked them strategically out of the way.
  • Stripped the old underlayment, furring strips, and flashings down to the plywood decking.
  • Inspected every inch of decking to identify and address hidden structural issues.

3. Installation of High-Performance Underlayment

  • Installed a double-layered 40# underlayment with cap nails to seal every fastener head, ensuring a watertight barrier.

4. Upgrading Roofing Components

  • Installed modern flashings, weather guard, and furring strips.
  • Upgraded wall flashings at the patio at no extra cost to meet our high standards of performance.

5. Tile Installation and Finishing Touches

  • Reinstalled concrete tiles following manufacturer specifications and modern building codes.
  • Left extra tiles for the solar service team in case they needed replacements during reinstallation.

6. Patio Roof Upgrade

  • Removed the old gravel patio roof and installed a self-adhered membrane with new drip edge for a clean, durable finish.

Project Timeline

The entire project, including roof replacement and preparation for solar panel reinstallation, was completed in 5 days.


Customer Results

  • The homeowner now has a durable and compliant roof that meets insurance requirements.
  • The updated roofing system ensures longevity and energy efficiency, ready to support solar panel reinstallation.
  • Upgraded components, including wall flashings and underlayment, provide added durability at no extra charge.

FAQs

1. Why was the existing concrete tile reused for this project?
The existing tiles were in good condition, and reusing them ensured HOA compliance and aesthetic consistency with the neighborhood.

2. How were the solar panels handled during the roof replacement?
We partnered with a trusted solar service company to safely remove, inspect, and store the solar panels. They will also handle reinstallation after the roof replacement.

3. What measures were taken to ensure the roof decking was in good condition?
After removing the old roofing materials, we inspected every inch of the plywood decking to address any hidden structural issues before installing new underlayment.

4. What is the benefit of using high-performance 40# underlayment?
This underlayment provides superior waterproofing and durability, sealing around every fastener head for a long-lasting roofing system.

5. How did you improve the patio roof?
We replaced the old gravel roof with a self-adhered membrane and new drip edge for better performance and a clean, updated look.

6. Were there any upgrades made at no extra cost?
Yes, we upgraded the wall flashings at the patio to ensure maximum longevity without charging the homeowner extra.

7. How long did the project take to complete?
The project was completed in 5 days, including preparation, roofing, and cleanup.


Need a roof replacement with solar panel removal in Chandler, AZ?

Contact Roof Rite AZ to schedule your project today!

#RoofRiteAZ #ChandlerAZ #RoofReplacement #SolarPanelRemoval #HighPerformanceUnderlayment

Whether you’re dealing with an aging roof, coordinating with solar panel installations, or meeting HOA compliance, our roofing experts in Chandler, AZ, have you covered. With precise workmanship and trusted solar partnerships, we deliver long-lasting, professional roofing solutions.

Contact Roof Rite Today:

Roof Rite is your trusted partner for roofing solutions that integrate with solar systems and ensure long-lasting protection for your home. Contact us today for a free estimate!

Share: