Project Overview
Roof Rite AZ partnered with a homeowner building a small addition to their home. The goal was to seamlessly integrate the new roof with their original 30-year-old roof, ensuring durability and aesthetic consistency. The project also required an extension to the existing patio, which involved creating a cohesive tie-in with a uniform waterproof membrane.
Challenges and Goals
- New Roof Integration: The new roof addition needed to match the existing roof in both color and profile.
- Tight Tie-In: Installing new underlayment and ensuring a secure connection between the new and old roofing materials.
- Patio Extension: Creating a water-resistant and visually cohesive patio roof membrane.
Recommended Solution
- Tile Match: Sourced new concrete tiles closely matching the existing roof's color and profile.
- Underlayment: Installed high-performance 40# modified underlayment with a double-layered system for durability.
- Patio Membrane: Applied a two-layer self-adhered membrane for complete water resistance and uniformity.
Execution Process
1. Coordinated Start
We worked closely with the framer and began roofing on the first day city inspectors allowed, minimizing exposure to the elements.
2. Material Preparation
- Stacked existing tiles on the original roof for later reinstallation.
- Delivered new tiles for the addition, ensuring a near-perfect color match.
3. Roof Deck Inspection
- Removed old underlayment from the existing roof.
- Inspected every inch of plywood to address potential hidden issues, such as rot or damage.
4. Chimney and Flashing Enhancements
- Added plywood to the chimney cricket to improve water flow.
- Replaced all chimney flashing with high-performance materials.
5. Waterproofing Installation
- Installed a double-layered, self-adhered membrane around the chimney and patio area.
- Tied the patio addition into the existing patio for a consistent and durable waterproof barrier.
6. Final Roofing Steps
- Installed new drip edge, birdstop metal, and flashing on the tile roof.
- Applied two layers of premium underlayment with plastic cap nails, followed by furring strips.
- Reinstalled existing tiles and placed new tiles strategically to maintain a seamless appearance from ground view.
7. Cleanup and Customer Request
- Moved leftover tiles to the homeowner’s backyard for potential future projects.
- Conducted a thorough cleanup of the worksite.
Results
- Timeline: Completed the project in just 4 days, ensuring the home was quickly secured and weatherproofed.
- Customer Satisfaction: Delivered a seamless roof addition that perfectly matched the existing roof, providing both visual appeal and long-term durability.
FAQ's
1. How did you ensure the new roof addition matched the original 30-year-old roof?
We sourced new concrete tiles that closely matched the original roof’s color and profile. By carefully blending the new tiles with the existing ones, we created a seamless aesthetic that minimizes visual disruption from the ground.
2. What steps were taken to ensure water resistance for the new and existing roofs?
We used a double-layered 40# modified underlayment for the reroofed areas and the new addition. For the patio, we installed a two-layer self-adhered membrane, ensuring a cohesive and durable water barrier across the entire roof structure.
3. How did you address potential hidden issues with the existing roof deck?
Before installing the new materials, we removed the old underlayment and thoroughly inspected every square inch of the roof deck plywood. This allowed us to identify and repair any rot or hidden damage, ensuring a solid foundation for the new roof.
4. How was the chimney area improved during the project?
We added plywood to the chimney cricket to enhance water flow around the area and replaced all chimney flashing with high-performance materials to ensure long-term durability and water resistance.
5. How did you handle the tie-in between the new addition and the existing patio?
We extended the patio roof with a double-layered self-adhered membrane, creating a uniform waterproof barrier that seamlessly connected the addition to the existing patio structure.
6. What was done with the leftover materials after the project?
At the customer’s request, we moved the leftover tiles to their backyard. These tiles can be used for future repairs or projects, providing the homeowner with peace of mind and convenience.
7. How long did the project take to complete?
The entire roofing project, including preparation, inspections, installation, and cleanup, was completed in just 4 days. This quick turnaround ensured the home was protected from the elements without compromising quality.
Why Roof Rite AZ?
This project highlights Roof Rite AZ's dedication to quality, precision, and customer care. From material selection to final cleanup, every step of the process was executed to meet the highest standards of craftsmanship and performance.
Contact Us:
Visit Roof Rite AZ to learn more about our roofing services or schedule your next project today!
#RoofRiteAZ #RoofAddition #RoofRepair #GilbertAZ #SeamlessRoofingSolutions